PREVIOUS
NEXT
CONTENTS
HOME
List of Tables
- Table 1: Monitoring devices installed at 44-45 Parliament Street
- Table 2: Depth of monitoring devices installed down a pre-formed borehole
- Table 3: Depth and position of moisture cell installation into archaeological deposits
- Table 4: Plant preservation recording sheet
- Table 5: Sediment descriptions for samples from Section 1 (north-west), Trench 1
- Table 6: Sediment descriptions for samples from Section 2 (south-east), Trench 1
- Table 7: Sediment descriptions for samples from Section 3 (south-west), Trench 1
- Table 8: Sediment descriptions for samples from Section 4 (north-east), Trench 1
- Table 9: Sediment descriptions for samples of boreholes
- Table 10: pH, loss-on-ignition, water content data
- Table 11: Some statistics for estimates of water content
- Table 12: Some statistics for estimates of pH
- Table 13: Some statistics for estimates of organic content
- Table 14: Comments on biota from selected samples from Trench 1
- Table 15: Scores for quality of preservation of organic components recorded from residues
- Table 16: Scores for completeness and colour of Trichuris eggs, together with semi-quantitative abundances of organic and inorganic sediment particles and other microfossils
- Table 17: Record of preservation of insect remains
- Table 18: Access tube installation
- Table 19: Ordnance Survey benchmark list
- Table 20: Borehole logs
- Table 21: Horizon description: borehole 1
- Table 22: Horizon description: borehole 2
- Table 23: Horizon description: borehole 3
- Table 24: Horizon description: borehole 4
- Table 25: Horizon description: borehole 5
- Table 26: Horizon description: borehole 6
- Table 27: Horizon description: borehole 7
- Table 28: Horizon description: borehole 8
- Table 29: Detailed analysis of four borehole cores
- Table 30: General analysis of all borehole cores
- Table 31: Moisture content of borehole cores
- Table 32: Laboratory analysis of water samples from 15 June 1995
- Table 33: Bacteriological examination of water samples from 15 June 1995
- Table 34: Laboratory analysis of water samples from
site visit of 27 June 1995
- Table 35: Soil water measurements by neutron probe for site visit of 27 June 1995: Access Tube 1
- Table 36: Soil water measurements by neutron probe for site visit of 27 June 1995: Access Tube 3
- Table 37: Moisture cell installation: point of insertion
- Table 38: Description of sample, recovered at point of moisture cell insertion
- Table 39: Results of sample analysis from moisture cell insertion
- Table 40: Resistance of moisture cells before and after installation
- Table 41: Dipwell installation
- Table 42: Depth of suction sampler installation
- Table 43: Ordnance Survey benchmark details
- Table 44: Sample analysis from borehole 2
PREVIOUS
NEXT
CONTENTS
HOME
© Internet Archaeology
URL: http://intarch.ac.uk/journal/issue11/3/tablist.html
Last updated: Wed Mar 6 2002