TAESP: Building Unit Dataset

Back | Other Data Sets | Building codes | New BU search

BU Number BU0065
Village Tembria
Related BUsBU0064 BU0065 BU0066 
Easting 490171.00
Northing 3875695.00
Elevation 503
Village Plan Tembria III
BU Summary Water channel, Tembria. One of three channels side by side; currently used as a water distributor. Metal sluices control flow of water. Dated to 1951. Near Rotsos mill, BU0064.
Location Pera Geitonia, neighborhood center
Vegetation Geraniums, Jasmine, garden potted plants in fifties houses on east side of road. Traditional houses against roadside on west side of road wiith no gardens in front.
Access public road
Associated Land houses in plot nos. 391, 544, 543
Length (m) 10.00
Width (m) 2.00
Height (m) -0.50
Levels Single
Habitable Yes
Stability I
Walls cement
Openings metal sluice gates
Floors cement
Building Type Water channel
Structure Type cement construction
Current Use water distributor
Past Use water distributor
Structure Name \'Gronthos Pera Geitnoias, Tembria', also 'diachoristiras'
Special Features 1951 'GR' cement plaque at south of structure.
Moderations/Alterations Cemented canals, previously earth and stone canals.
Description Three water canals side by side (moirasia) taking water in from one main channel descending from the southermost entry point of diversion near mill on 'Rotsos' location plot no.514 (BU 0064). Situated on east side of main village road in front of plots 319, 544, 543. From entry channel south, 0.50m wide, water flows into a 2X 1.5 approx.'bed' where it is slowed down by means of intercepting low wall with opening 0.50 wide just in front of channel. Water then flows into 'bed' 2X4m just before three canal branches. Metal sluice gates (kopses) 1m in from canal walls, suspended on metal beam, control rate of water flow into each individual canal. Westernmost leads off onto higher level. 2 channels out of 3 take water to Korakou and Evrichou while one takes water to Tembria. Photos in private archive. Water flows under cement slab 'bridges' leading into houses on east side, of 1950 ties design, while houses on west side of road are of the continuous built type. Possibly this was original village edge, that water flowed by and village expanded eastward in the early fifties.TAESP 2002 - Photos by Chris
Ownership Other
Owner communal irrigation system (Koinotiko Ardeftiko)
Date 1951
Period 1100 No
Period 1601 No
Period 1701 No
Period 1801 No
Period 1851 Yes
Period 1901 No
Period 1951 No
Oral Information Georgios Herodotou, Neroforos (Tel. 02 932313), Appointed Neroforos (water superintendent). Before being cemented in 1951, channels were made of earth walls and 'kopses' were fashioned out of earth, stones, sacks.
Recorded By SEZ
Recorded Date 3/7/2001 00:00:00
Entered By SEZ
Entered Date 29/7/2001 00:00:00


 BACK   CONTENTS   HOME   COMMENTS